Stamped Concrete Cost in Virginia Beach, VA (2026)
BLS OEWS 2025 wage data · updated August 2026
Virginia Beach · per sq ft
$12.14 – $26.16

Stamped Concrete costs $12.14 to $26.16 per sq ft in Virginia Beach in 2026. For a 400 sq ft project, expect $4,858 – $10,462 installed, typically near $7,660. That is about 2% below the Virginia average.

Typical sq ft
$19.15
vs state average
−2%
Local construction wage
$27.87
Frost depth
18 in

Virginia Beach stamped concrete calculator

Estimated installed cost
–
–

Planning estimate. Wage index applies to the labor share only; materials held at national prices. Get three written quotes.

Why Virginia Beach runs below the Virginia average

Construction wages in Virginia Beach average $27.87 per hour against $28.67 statewide. Virginia Beach sits below the Virginia average because the statewide figure is pulled up by higher-wage metros elsewhere in the state.

Labor is about 58% of the installed cost on this type of work, and it is the part that actually moves between markets. Materials are priced by national manufacturers and barely shift, which is why the gap between metros is narrower than wage differences alone suggest.

Stamped Concrete cost by project size in Virginia Beach

Project sizeVirginia Beach rangeTypical
100 sq ft$1,214 – $2,616$1,915
200 sq ft$2,429 – $5,231$3,830
300 sq ft$3,643 – $7,847$5,745
400 sq ft$4,858 – $10,462$7,660
600 sq ft$7,286 – $15,694$11,490
800 sq ft$9,715 – $20,925$15,320
1,000 sq ft$12,144 – $26,156$19,150
1,500 sq ft$18,216 – $39,234$28,725

Where the money goes

For a 400 sq ft project in Virginia Beach at roughly $7,660, a typical bill splits like this:

Line itemShareCost
Labor58%$4,443
Materials28%$2,145
Site prep & equipment8%$613
Overhead, disposal & finishing6%$460

Virginia Beach compared with other Virginia markets

AreaCost per sq ftvs Virginia Beach
Richmond$12.10 – $26.050%
Roanoke$11.52 – $24.81−5%
Charlottesville$12.24 – $26.36+1%
Lynchburg$11.51 – $24.79−5%
Virginia average$12.34 – $26.57+2%

Ground conditions and code in Virginia Beach

Virginia Beach sits in IECC zone 4 (mixed) with a design frost depth of about 18 inches. Footings and posts must extend below that line, which adds excavation depth and concrete volume that warm-climate estimates leave out.

Permits in Virginia Beach

A residential permit for this work typically runs around $450 in Virginia. Permit cost is rarely included in a contractor quote, so budget it separately and confirm scope with the Virginia Beach building department before work begins.

Hiring in Virginia Beach

Get three written, itemised quotes from licensed and insured contractors, each specifying the same scope and grade of material. Ask for local references and check the licence is current in Virginia.

Frequently asked questions

How much does stamped concrete cost in Virginia Beach?

In 2026, stamped concrete costs $12.14 to $26.16 per sq ft in Virginia Beach. For a 400 sq ft project, the installed total typically lands between $4,858 and $10,462.

Is Virginia Beach more expensive than the rest of Virginia?

No. Virginia Beach actually runs about 2% below the Virginia average. Local construction wages are $27.87/hr against $28.67/hr statewide.

Do I need a permit in Virginia Beach?

Most work of this type and value requires a permit. Budget around $450 in Virginia and allow extra time for review in metro jurisdictions.

How do I compare quotes in Virginia Beach?

Get three written, itemised quotes covering identical scope and materials. A bid far below the others usually signals a reduced specification rather than better value.

Nearby markets

Open the full stamped concrete calculator →

Methodology. Local pricing applies the Virginia Beach construction wage from the BLS Occupational Employment and Wage Statistics (2025 release, $27.87/hr) to the labor share of a national 2026 cost baseline. Materials are held at national prices. Figures refresh automatically with each BLS release. Planning estimates, not quotes. See our full methodology.