14×14 Stamped Concrete Cost (2026)

HomeConcrete › 14×14 stamped concrete
14×14 Stamped Concrete Cost (2026)
Prices updated August 2026
196 sq ft · installed
$2,548 – $5,488

A 14×14 stamped concrete costs $2,548 to $5,488 installed in 2026, with most projects landing near $4,018. That works out to $13.00 – $28.00 per sq ft. Your state changes the number — use the calculator below.

14×14 Stamped Concrete cost calculator

Estimated installed cost

Planning estimate only. State pricing applies a construction wage index to the labor share; materials are held at national prices. Get three written quotes before committing.

How much concrete does a 14×14 slab need?

ThicknessCubic yards80 lb bags60 lb bags
4 inch2.42 cu yd109146
5 inch3.02 cu yd137182
6 inch3.63 cu yd164218
8 inch4.84 cu yd218291

Order about 10% extra to cover spillage and uneven subgrade. Once a pour passes roughly 2 cubic yards, ready-mix delivery is almost always cheaper and faster than mixing bags by hand.

14×14 Stamped Concrete cost by state

Labor is about 58% of the bill, so the same 14×14 project swings widely between states:

Cheapest statesCostPriciest statesCost
Mississippi$3,599Hawaii$4,671
Arkansas$3,622California$4,531
Alabama$3,645New York$4,484
South Dakota$3,668Massachusetts$4,437
West Virginia$3,692Washington$4,391

What fits on a 14×14 stamped concrete?

A 14×14 slab works as a patio, single-car parking pad, or workshop floor. This size is large enough that ready-mix delivery beats bagged concrete comfortably.

Cost by grade and finish

Specification moves the price as much as size does. For a 14×14 project:

OptionTypical costvs standard
Broom finish (standard)$4,018baseline
Smooth trowel$4,380+9%
Exposed aggregate$5,424+35%
Stamped / decorative$7,433+85%

How 14×14 compares with nearby sizes

SizeInstalled costvs 14×14
10×10$2,050-49%
12×12$2,952-27%
12×16$3,936-2%
14×14 (this page)$4,018
16×20$6,560+63%

What the price includes

The range above covers materials, labor, standard site preparation, and cleanup for a 14×14 project with normal access. It excludes permits, demolition or removal of existing work, drainage corrections, and upgrades beyond a standard specification.

Materials alone run roughly $1,688 for this size, which is the figure to start from if you are weighing doing it yourself.

What changes the price of a 14×14 stamped concrete

Thickness and reinforcement

Moving from 4 to 6 inches raises concrete volume by half. Rebar instead of wire mesh adds roughly $0.75 per square foot but sharply reduces cracking under vehicle loads.

Subgrade condition

Soft, wet, or uneven ground needs excavation and a compacted gravel base. A good base does more for crack prevention than extra slab thickness.

Site access

If a truck cannot reach the pour, concrete has to be pumped or barrowed. Pumping typically adds several hundred dollars to a small job.

Finish

A broom finish is included in base pricing. Stamping, staining, or exposed aggregate can nearly double the installed cost.

Demolition

Removing an existing slab adds material disposal and machine time, often $2 to $6 per square foot before the new pour starts.

How long does a 14×14 stamped concrete take?

Forming and pouring a 14×14 slab is typically a one-day job for a small crew, sometimes two if the subgrade needs work. Concrete takes foot traffic in 24 to 48 hours, reaches most of its strength in 7 days, and continues curing for 28 days. Keep vehicles off for at least a week.

Frequently asked questions

How much does a 14×14 stamped concrete cost?

A 14×14 stamped concrete costs $2,548 to $5,488 installed in 2026, averaging about $4,018. State labor rates move that figure by 20% or more in either direction.

How much is that per sq ft?

It works out to $13.00 to $28.00 per sq ft. Larger projects usually land slightly lower per sq ft because setup and mobilisation costs spread across more area.

What would it cost to do it myself?

Materials for a 14×14 project run roughly $1,688. The rest is labor, equipment, and disposal. Factor in tool rental and the cost of correcting mistakes before deciding.

Which states are cheapest for this project?

Mississippi and Arkansas are among the lowest at around $3,599, while Hawaii runs closer to $4,671 for the same specification.

How many bags of concrete for a 14×14 slab?

At 4 inches thick, a 14×14 slab needs about 2.42 cubic yards, which is roughly 109 80 lb bags or 146 60 lb bags. Above about 2 cubic yards, ready-mix delivery is usually cheaper.

How long does a 14×14 stamped concrete take to complete?

Forming and pouring a 14×14 slab is typically a one-day job for a small crew, sometimes two if the subgrade needs work. Concrete takes foot traffic in 24 to 48 hours, reaches most of its strength in 7 days, and continues curing for 28 days. Keep vehicles off for at least a week.

What most often pushes a 14×14 project over budget?

Thickness and reinforcement and subgrade condition are the two most common. Moving from 4 to 6 inches raises concrete volume by half. Rebar instead of wire mesh adds roughly $0.75 per square foot but sharply reduces cracking under vehicle loads.

Do I need a permit for a 14×14 stamped concrete?

Most jurisdictions require a permit for work of this type and value, and the fee commonly scales with declared project value. Budget a few hundred dollars and confirm with your local building department before work starts, since unpermitted work can surface during a sale or an insurance claim.

Other stamped concrete sizes

Open the full stamped concrete calculator →

Methodology. Figures are 2026 national installed baselines; state pages apply a BLS-derived wage index to the labor share. Material quantities use standard yields (80 lb bag = 0.60 cu ft, 60 lb bag = 0.45 cu ft). Planning estimates, not quotes. See our full methodology.

Leave a Comment